Time Sensitive Workplan Information: The following ranked workplan is dated February 2, 2025.
View the original 2025 N. Olympic LE Ranked Workplan (DOCX)
2025 N. Olympic LE Workplan Proposals
Date: 2-Feb-25
- Cap Max Possible Score = 206.96
- Non-Cap Max Possible Score = 163.47
| Rank | Project ID | Title | Category | Weighted Mean Score | Normalized Score |
|---|---|---|---|---|---|
| 1 | 09092.2 | Dungeness River Floodplain Restoration | Capital | 174.23 | 0.842 |
| 2 | 09030.1 | Dungeness River Riparian Habitat Protection | Capital | 166.77 | 0.806 |
| 3 | 22003 | Dungeness Bay Shoreline Restoration | Capital | 166.04 | 0.802 |
| 4 | 16103.1 | Indian Creek Habitat Restoration Project | Capital | 165.71 | 0.801 |
| 5 | 09029.2 | Dungeness River Large Wood Restoration | Capital | 165.69 | 0.801 |
| 6 | 09055.2 | Elwha Estuary Conservation and Restoration | Capital | 164.53 | 0.795 |
| 7 | 09091.1 | Dungeness River Instream Flow Restoration-Irrigation Efficiencies | Capital | 162.13 | 0.783 |
| 8 | 13102 | Little River LWD Project | Capital | 161.79 | 0.782 |
| 9 | 09016.3 | Elwha River Engineered Log Jams | Capital | 161.22 | 0.779 |
| 10 | 22005 | Monitoring Dungeness Floodplain Changes | Non-Capital | 126.31 | 0.773 |
| 11 | 09032.1 | Dungeness Drift Cell Conservation | Capital | 159.63 | 0.771 |
| 12 | 09031.3 | Dungeness River Riparian Restoration | Capital | 159.51 | 0.771 |
| 13 | 09009.1 | Pysht River Salt Marsh Estuary Restoration Project | Capital | 157.25 | 0.760 |
| 14 | 16102 | Morse Creek Acquisition & Restoration | Capital | 154.32 | 0.746 |
| 15 | 12098.2 | Dungeness River Instream Flow Restoration-Storage | Capital | 153.90 | 0.744 |
| 16 | 09093 | North Sequim Bay Drift Cell Conservation Project | Capital | 153.18 | 0.740 |
| 17 | 24001 | Elwha River Salmon Monitoring | Non-Capital | 120.75 | 0.739 |
| 18 | 14106 | Elwha Acquisition and Restoration Project | Capital | 152.78 | 0.738 |
| 19 | 12096 | WRIA 19 Priority Acquisitions | Capital | 152.70 | 0.738 |
| 20 | 11088.3 | Ennis Creek Fish Passage Barrier Removal | Capital | 152.32 | 0.736 |
| 21 | 13101.1 | Lower Hoko Acquisition and Restoration Project | Capital | 150.08 | 0.725 |
| 22 | 11085.2 | South Fork Pysht River Watershed Wood Restoration | Capital | 148.30 | 0.717 |
| 23 | 19105.1 | Upper Cowan Ranch ELJ Project | Capital | 148.22 | 0.716 |
| 24 | 14107 | Sequim Bay Shoreline Restoration | Capital | 147.93 | 0.715 |
| 25 | 09013 | Lower Salt Creek Restoration and Protection | Capital | 147.68 | 0.714 |
| 26 | 11087 | Elwha River Revegetation Project | Capital | 147.42 | 0.712 |
| 27 | 19104 | Lyre River Habitat Restoration Project | Capital | 146.36 | 0.707 |
| 28 | 23002 | Port Angeles Harbor/ Tributaries Conservation and Restoration | Capital | 146.20 | 0.706 |
| 29 | 09053 | Clallam Watertype Inventory and Assessment | Non-Capital | 114.76 | 0.702 |
| 30 | 10079 | Lower Morse Creek Feasibility Study | Capital | 144.02 | 0.696 |
| 31 | 09086.1 | Pysht Floodplain Acquisition and Restoration | Capital | 143.40 | 0.693 |
| 32 | 09001.2 | Little Hoko River Large Wood Restoration Project | Capital | 143.02 | 0.691 |
| 33 | 11084 | Upper Hoko LWD Restoration Project | Capital | 142.77 | 0.690 |
| 34 | 22004 | Ediz Hook Drift Cell Feasibility | Capital | 138.97 | 0.672 |
| 35 | 19102 | Hoko Culvert #80001279 Replacement | Capital | 136.91 | 0.662 |
| 36 | 16104 | Elwha Hot Springs Road Restoration | Capital | 136.53 | 0.660 |
| 37 | 10080.3 | Lyre River Protection and Restoration | Capital | 134.36 | 0.649 |
| 38 | 09026 | Morse Creek Property Acquisition | Capital | 133.90 | 0.647 |
| 39 | 09015.1 | Kreaman Creek, Trib. To Salt Creek | Capital | 133.04 | 0.643 |
| 40 | 09027.2 | Siebert Creek Ecosystem Protection Project | Capital | 131.84 | 0.637 |
| 41 | 22001 | Wright’s Creek Fish Passage Project | Capital | 130.84 | 0.632 |
| 42 | 09003 | WRIA 19 Riparian Restoration | Capital | 130.70 | 0.632 |
| 43 | 21001 | Expansion of Shipwreck Point NRCA | Capital | 130.65 | 0.631 |
| 44 | 11090.1 | Siebert Creek Large Wood Restoration: Old Olympic Highway to Highway 101 | Capital | 129.65 | 0.626 |
| 45 | 22002 | Hoko Tributary Fish Passage Correction: Culvert #80001331 | Capital | 129.43 | 0.625 |
| 46 | 10078.1 | McDonald Creek Large Wood Restoration | Capital | 127.74 | 0.617 |
| 47 | 11094 | Chicken Coop Road Culvert Replacement Project | Capital | 123.37 | 0.596 |
| 48 | 19101 | WRIA 19 Fish Passage Corrections on Joyce-Piedmont Road | Capital | 122.28 | 0.591 |
| 49 | 23001 | Butler Creek Fish Passage Design and Construction | Capital | 118.75 | 0.574 |
| 50 | 09015 | Salt Creek Final Fish Passage Corrections Project | Capital | 117.14 | 0.566 |
| 51 | 09021 | Valley Creek Restoration Phase 3 | Capital | 116.22 | 0.562 |
| 52 | 09004.1 | Hoko Watershed Instream LWD Restoration Project | Capital | 109.21 | 0.528 |
| 53 | 09005 | Sekiu Mainstem (RM 2-5) LWD Restoration | Capital | 105.97 | 0.512 |
Projects ranked 48 up are eligible to apply for SRFB/PSAR funding
Funded Projects/ Not Ranked
| Project ID | Title | Category |
|---|---|---|
| 19103.1 | Johnson Creek, Triple Culverts Replacement | Capital |
| 09011 | Twin River Acquisition | Capital |
| 09039.2 | McDonald Creek Barrier Removal and Channel Restoration | Capital |